读知识>英语词典>easement翻译和用法

easement

英 [ˈiːzmənt]

美 [ˈiːzmənt]

n.  地役权(穿越或征用某人土地的权利); 安逸; 安乐

复数:easements 

经济

BNC.30145 / COCA.20140

牛津词典

    noun

    • 地役权(穿越或征用某人土地的权利)
      the right to cross or use sb's land for a particular purpose
      1. 安逸;安乐
        a state or feeling of peace or happiness

        英英释义

        noun

        • the act of reducing something unpleasant (as pain or annoyance)
          1. he asked the nurse for relief from the constant pain
          Synonym:easingalleviationrelief
        • (law) the privilege of using something that is not your own (as using another's land as a right of way to your own land)

          双语例句

          • Easement is an important system in The Law of Real Property.
            地役权是物权法上的一项重要制度。
          • With the constant change and innovation of the use form of the real, the superiority of easement has already reflected day by day.
            随著物之利用形式的不断变化和创新,地役权的优越性已日益体现。
          • Inspiration of Environmental Protection Easement by Means of Private Law
            论私法手段下地役权制度对环境保护的启示
          • Cue up a touch more quantitative easement, in the shape of that big bad bond buy.
            为再多一些定量宽松做好准备吧,其形式是大规模的不良债券购买。
          • Finally, the author made an explanation about the option of legislation system of easement.
            最后对地役权制度立法体系的选择作了说明。
          • At last, it clarifies the nature of the neighboring right by comparing it with personal right, easement and environment right.
            最后,从相邻权与人格权、地役权、环境权的比较中明晰相邻权的性质。
          • Easement and neighbor right are important for using water.
            因此,我国的水权包括水资源所有权、使用权和地役权,在水资源的利用中,主要表现为水资源使用权人之间的相邻权关系和地役权关系。
          • Mathematical analysis on the central line equation of easement curve in documents is processed.
            对文献中所建的缓和曲线中线方程进行了数学分析。
          • A right or entitlement which forms part of the ownership of a property and which passes to a new owner when title passes ( i.e.an easement or right of way over another property).
            构成物业部分所有权,随产权一同转移给新所有人的权力。
          • But the construction phase can only begin after route selection, easement negotiations, environmental permitting, and many other pre-construction actions have been accomplished.
            但是管道的建设期是在管道定线,土地使用权限和环境评估通过之后才能进行,并且大多数的管道施工的前期工作都已经完成了。