读知识>英语词典>overburden翻译和用法

overburden

英 [ˌəʊvəˈbɜːdn]

美 [ˌoʊvərˈbɜːrdn]

v.  使负担过重

过去分词:overburdened 过去式:overburdened 现在分词:overburdening 第三人称单数:overburdens 

TOEFL经济

BNC.20075 / COCA.20715

牛津词典

    verb

    • 使负担过重
      to give sb/sth more work, worry, etc. than they can deal with

      英英释义

      noun

      • an excessive burden
          Synonym:overload
        1. the surface soil that must be moved away to get at coal seams and mineral deposits

          verb

          • burden with too much work or responsibility
            1. load with excessive weight

              双语例句

              • Stoping Technique of NO 100 Ore Body under Large Overburden Rock
                大规模覆岩下100号矿体残矿安全回采技术
              • Application of radioisotope logging technique to the testing of the coefficient of permeability in the overburden layers of riverbed
                放射性同位素测井技术在河床覆盖层渗透系数测试中的应用
              • The deep overburden will also appear horizontal displacement to upper and down streams after dam construction.
                受坝体的影响,坝基深厚覆盖层也会向上、下游发生水平位移;
              • Research on fractal characterization of mined crack network evolution in overburden rock stratum under deep mining
                深部开采上覆岩层采动裂隙网络演化的分形特征研究
              • Dynamic Analysis of Asphalt Concrete Core Rockfill Dams on Deep Overburden
                深覆盖层上沥青混凝土心墙堆石坝动力分析
              • This paper summarizes the new freezing technology used in construction of the auxiliary shaft of Longgu Colliery in thick overburden.
                本文总结了龙固副井的冻结施工工艺,为巨野煤田以及深厚表土的冻结施工提供了经验和技术保证。
              • Study on Debris Flow Forming Reasons in Overburden Layer During Transition Mining from Open Pit Mine to Underground Mine The oil workers drilled down another 10 feet to find oil.
                露天转地下开采覆盖层形成泥石流原因的研究在地下打洞石油工人为了开采石油又往下钻了10英尺。
              • The process of ore-drawing in block caving is completed under overburden.
                自然崩落法放矿基本上都是在覆盖岩层下进行的。
              • Application of the Technology of Dynamic Monitoring by Network Parallel Electrical Method in Overburden Failure
                网络并行电法在覆岩破坏动态监测中的应用
              • Suitability study of diaphragm wall in foundation treatment with thick overburden layer
                地下连续墙在深厚覆盖层地基处理中的适宜性研究